Archive

January 21, 2026

Browsing

Astral Resources NL (ASX: AAR) (Astral or the Company) is pleased to report assay results received from a 17-hole reverse circulation (RC) drill program for 2,954 metres completed at the Kamperman Deposit, part of its 100%-owned Feysville Gold Project (Feysville), located ~14km south of Kalgoorlie in Western Australia (Figure 1).

HIGHLIGHTS

Feysville Project

  • Assay results received for 17 RC holes (2,954m) drilled recently at Kamperman, part of the 100%-owned Feysville Gold Project in WA. The program tested a variety of targets designed both to increase the Mineral Resource and improve understanding of the deposit, with a specific focus on high-grade zones. Best results include:
    • 14m at 6.79g/t Au from 192m including 2m at 23.8g/t Au from 193m (FRC463)
    • 13m at 6.60g/t Au from 44m including 1m at 57.6g/t Au from 46m and 1m at 10.9g/t Au from 48m, 4m at 2.06g/t Au from 62m and 4m at 3.81g/t Au from 88m (FRC457)
    • 21m at 3.11g/t Au from 115m including 1m at 13.4g/t Au from 132m (FRC460)
    • 15m at 3.70g/t Au from 123m including 1m at 16.4g/t Au from 124m and 1m at 21.1g/t Au from 135m, 6m at 2.79g/t Au from 158m, 23m at 2.57g/t Au from 180m including 3m at 13.7g/t Au from 197m and 3m at 2.57g/t Au from 208m (FRC452)
    • 14m at 2.66g/t Au from 179m (FRC461)
    • 27m at 0.78g/t Au from 21m and 25m at 1.68g/t Au from 50m including 1m at 11.7g/t Au from 59m and 1m at 10.5g/t Au from 62m (FRC453)
    • 6m at 4.10g/t Au from 210m including 1m at 13.4g/t Au from 212m (FRC454)
  • The drill program has confirmed the presence of north-west striking high-grade gold mineralisation that is not currently included in the Kamperman Mineral Resource model, as well as confirming depth extensions to the southern lode and additional high-grade mineralisation in the footwall of the southern lode.
Mandilla Project
  • A 4-hole (1,641m) DD program has been completed on the eastern flank of the Theia deposit, part of the 100%-owned Mandilla Gold Project. The drill program was designed to test for a potential steeply dipping sub-parallel mineralised structure to the east of Theia. Best results include:
    • 4.15m at 33.2g/t Au from 164.3m including 0.5m at 269.6g/t Au from 165m, 12.13m at 1.29g/t Au from 173.87m including 0.3m at 23.4g/t Au from 173.87m and 1.79m at 6.21g/t Au from 253.47m including 0.58m at 17.6g/t Au from 253.82m (AMRCD140)
    • 0.3m at 30.7g/t Au from 336.26m (AMRCD139)
  • Quartz, pyrite and visible gold1 were intersected in each of the four holes, confirming the potential for Theia to host additional mineralised structures.
  • A 3-hole (775.6-m) DD program was also completed at Theia. The program was designed to target a previously intersected “230 Shear” structure. Drilling successfully intersected this distinct, narrow high-grade shear zone with best results including:
    • 1.57m at 22.8g/t Au from 168.59m including 0.6m at 59.2g/t Au from 169.56m, 7.12m at 1.42g/t Au from 175.08m including 0.3m at 25.9g/t Au from 175.51m, 8.73m at 0.95g/t Au from 222.44m and 4.90m at 1.28g/t Au from 259m including 0.3m at 13.7g/t Au from 262.07m (AMRCD137)
    • 2.27m at 4.94g/t Au from 161m including 0.47m at 22.8g/t Au from 161.93m and 5.33m at 1.08g/t Au from 202.85m (AMRCD138)

Astral Resources’ Managing Director Marc Ducler said: “The assay results from the recent RC program at Feysville have demonstrated the excellent potential for both the overall gold grade and the deposit size at Kamperman to increase.

“The program was highly successful in achieving its aims to extend interpreted high-grade gold zones beyond the existing Mineral Resource.

“The centrally located drill-hole, FRC457, returned an outstanding intercept of 13m at 6.60g/t Au, representing a very successful extension to a north-west striking high-grade ore shoot which appears to be projecting beyond the current deposit limits.

“Drill-hole FRC463 also returned a spectacular high-grade intercept. Drilled south and well beyond the current Resource testing for a south-plunging ore zone at depth, drilling successfully intersected 14m at 6.79g/t Au from 192m, to confirm one of our deepest zones of high-grade gold mineralisation so far and providing us with a hint of the greater potential still remaining at Kamperman.

“Over the Christmas period, Astral received notice from the DMPE of the grant of our Mining Licence application over areas of Feysville. This marks an important step as we progress towards submission of the Mining Proposal and execution of a JV agreement with Mineral Mining Services for the development of the Think Big Gold Mine. This would establish an early revenue opportunity for Astral against the backdrop of record gold prices to assist with securing overall development funding for the Mandilla Gold Project.

“Meanwhile at the cornerstone Theia deposit at Mandilla, we received assay results from two diamond drill programs, with further outstanding high-grade intercepts recorded.

“The first, a 3-hole program targeting the “230 Shear”, returned results such as 1.57m at 22.7g/t Au and 2.27m at 4.94g/t Au in separate holes, confirming the presence of this discrete, narrow, high-grade shear zone which strikes through the main Theia deposit.

“Importantly the shear, intersected in all three holes, remains mineralised at depth, with the potential to delineate additional sub-parallel repeats both within and extensional to Theia.

“A second 4-hole diamond drill program tested a potential steeply dipping sub-parallel structure to the east of Theia. As an initial positive sign visible gold was logged in all four holes, with a best result including a very high-grade intersection of 4.15m at 33.2g/t Au from 164.3m in hole AMDRCD137.

“Following our successful capital raise completed in December, Astral has funds on hand to maintain an aggressive exploration focus and complete the Mandilla DFS targeting a Final Investment Decision – all while maintaining a significant component of the equity requirement for development of the Mandilla Gold Project.

“Astral has ramped up exploration activities for 2026 with three drill rigs (2 RC and 1 DD rig) currently operating on site.”

Click here for the full ASX Release

This post appeared first on investingnews.com

Jindalee Lithium Limited (Jindalee, or the Company; ASX: JLL, OTCQX: JNDAF) is pleased to report assay results from the drilling program at the McDermitt Lithium Project completed late 2025.

  • All holes returned strong lithium and magnesium intercepts from shallow depths, including:
    • R92: 36.5m @ 1951 ppm Li & 5.23% Mg from 24.5m
    • R93: 15.5m @ 1456 ppm Li & 5.45% Mg from 3.6m
    • R94: 66.0m @ 1599 ppm Li & 4.12% Mg from 0.4m
    • R95: 110.6m @ 1519 ppm Li & 4.80% Mg from 23.0m
    • R96: 20.1m @ 1514 ppm Li & 5.29% Mg from 0.4m
  • Three holes twinning earlier RC holes confirmed good correlation with RC results
  • High-quality core samples retained for metallurgical testwork (lithium and magnesium)

Background

On 3 December 2025 Jindalee announced the completion of a large diameter core drilling program at the Company’s 100% owned McDermitt Lithium Project1 (McDermitt, Project), one of the largest lithium deposits in the United States (US) and of global significance2 (Figure 1).

The program comprised five PQ3 (8.5cm diameter) core holes designed to obtain samples for metallurgical testwork to further optimise lithium recoveries, as well as unlock value from the significant magnesium endowment at McDermitt, via the value optimisation program announced late October 20253. The drilling also provided valuable geological and geotechnical data on the deposit, with three of the holes collared to twin reverse circulation (RC) holes drilled in 2021 and 20224.

Discussion

All five holes returned strong lithium and magnesium intercepts from shallow depths as summarised above and in Annexure A. Three holes (R94, R95 and R96) were collared to twin RC holes drilled previously by Jindalee (MDRC-24, MDRC-21 and MDRC-22 respectively), with assays from the recent core holes showing good correlation with the RC results (refer Table 1). Jindalee will now undertake detailed geostatistical analysis to further evaluate the relationship between the results from RC and core drilling to help determine the optimal drilling methods for future programs.

Click here for the full ASX Release

This post appeared first on investingnews.com

Trading in the securities of Cyprium Metals Limited (‘CYM’) will be halted at the request of CYM, pending the release of an announcement by CYM.

Unless ASX decides otherwise, the securities will remain in trading halt until the earlier of:

  • the commencement of normal trading on Friday, 23 January 2026; or
  • the release of the announcement to the market.

CYM’s request for a trading halt is attached below for the information of the market.

Issued by
ASX Compliance

Click here for the full ASX Release

This post appeared first on investingnews.com

TSX-V: WLR
Frankfurt: 6YL

Standards of Disclosure for Mineral Projects and its Companion Policy 43-101CP with an effective date of January 6, 2026.

The report was co-authored by Ronacher McKenzie Geosciences Inc. who conducted a site visit in 2025 to verify work completed since the 2021 season that has been reported by WLR which included a drill program in 2022, a minor sampling program on the Silver Hart claims in 2024, completion of a trenching program and minor reconnaissance efforts on the adjoining and acquired Blue Heaven claims in 2024, and reclamation programs on all of the claims in 2023 and 2024.

Subject to financing WLR intends to conduct drilling, socio-economic, environmental and engineering studies and initiate a Preliminary Economic Assessment of the Silver Hart Project in 2026.

The CIM Standards require that an estimated mineral resource must have reasonable prospects for eventual economic extraction. A summary of the SHP mineral resource economic and technical parameters and/or assumptions is presented in Table 1 below. A pit-shell was optimized based on silver equivalent values calculated using the economic parameters in the table.

Table 1: Summary of the Siver Hart Project Economic and Technical Parameters/Assumptions

Item

Units

Extended

Mining cost

CAD$/t all material

10.00

Processing cost

CAD$/t crude feed

25.50

G&A cost

CAD$/t crude feed

5.00

Exchange rate

CAD$ to US$

0.75

Ag price

USD$/oz

23.30

Pb price

US$/metric tonne

1,892

Zn price

US$/metric tonne

2,505

Metallurgical recovery

Percentage

80

Overall pit slope

Degrees

45

Silver Equivalent Calculation:  AgEq g/t = [(Ag ppm x %Rec. x Price/g) + (Pb ppm x %Rec. x Price/g) + (Zn ppm x %Rec. x Price/g)]/ (Ag Price/g x %Rec).
Note: Rec. = metallurgical recovery. AgEq=Silver Equivalent.

Block grade interpolation was performed using the ordinary kriging (OK) technique. The estimated pit constrained mineral resources were classified as Inferred, despite some close drill hole spacing in some zones and the continuity of mineralization as confirmed by variography, mainly because of the lack of substantiated metal recoveries and suspect collar surveys. Table 2 summarizes the update MRE fpr the Silver Hart Project effective as at January 6, 2026.

Table 2: Silver Hart Project – Pit Constrained Mineral Resources at a Cut-off Grade of AgEq>=50 g/t 

Mining Method

Domain

Mass (Tonnes)

Average Value

Material Content

AgEq g/t

Ag g/t

Pb %

Zn %

AgEq

Million oz

Ag Million oz

Pb

Million lb

Zn

Million lb

Open

Pit

TM_Zone

269,000

229.8

152.7

0.56

1.88

1.985

1.319

3.3

11.1

S_Zone

127,000

334.5

262.1

0.36

1.90

1.368

1.072

1.0

5.3

KL_Zone

1,026,000

110.9

35.7

0.11

2.17

3.659

1.178

2.5

49.0

K_Zone

265,000

79.8

14.2

0.09

1.90

0.680

0.121

0.5

11.1

M_Zone

202,000

173.6

98.1

0.58

1.82

1.128

0.637

2.6

8.1

Total

1,889,000

145.2

71.3

0.24

2.03

8.820

4.327

9.9

84.7

Notes:

1.

The effective date of this mineral resource statement is January 6, 2026.

2.

The qualified person responsible for this Mineral Resource Estimate (MRE) is Charley Murahwi, M.Sc., P.Geo., FAusIMM.

3.

The mineral resources have been estimated in accordance with the CIM Best Practice Guidelines (2019) and the CIM Definition Standards (2014)

4.

Ordinary Kriging (OK) interpolation was used with a single block size of 5m x 5m x 5m.

5.

The Economic & Technical parameters/assumptions are summarized in Table 1.1 above.

6.

The mineral resource results are presented in-situ within the optimized pit. Mineralized material outside the pit has not been considered as a part of the current MRE.

7.

The tonnes and metal contents are rounded to reflect that the numbers are an estimate and any discrepancies in the totals are due to the rounding effects.

8.

Mineral resources unlike mineral reserves do not have demonstrated economic viability.

The report also noted that:

  • All the deposits remain open along strike in both directions and down dip, and, in particular, the largest deposit (KL zone). The likelihood of some of the deposits merging (i.e., K to KL, TM main to H and S to M) cannot be ruled out if a program of step out and infill drilling is implemented.
  • The growth potential for the mineral resource is satisfactory as the deposits remain open for expansion in all directions (i.e., strike in both directions and down dip).
  • Prospects for growing the resource via new discoveries appear favorable based on the fact that several known mineral occurrences and anomalies within the Silver Hart and the adjacent Blue Heaven claims remain to be test drilled for resource evaluation.
  • The early initial metallurgical tests completed previously in 1986 and, in 2006, do not have substantiated documentation regarding representativity and location of the samples and, thus, the need for a fresh start is warranted. Nonetheless, the general response of lead, zinc and silver to flotation in those early tests was generally positive.

The NI-43-101 MRE report has been filed on its SEDAR+ profile and will soon be published on the Company’s website at www.walkerlaneresources.com

Kevin Brewer, President and CEO of WLR, commented ‘The MRE is a major milestone in our exploration efforts at Silver Hart. The MRE was estimated at prices much lower than current spot metal prices, which if used in the silver equivalent calculation in the MRE calculation result in an improved silver equivalent grade. You can do the math. As a result, WLR now intends to advance our evaluation of this project to consider a production decision in the short term. Mineralization in all of the zones in the Silver Hart Project start at surface and therefore are expected to be amenable to small scale open pit mining. WLR and its predecessor company CMC Metals Ltd. have been working on this project for 20 years and it is now prepped to take the project to the next stage.’

Next Steps – Highlights of Proposed 2026 Exploration Program and Preparation of a Preliminary Economic Assessment

Walker Lane Resources Ltd. also announced that it is preparing to commence planning for the next stage of its exploration program and evaluation of the Silver Hart Project which will contribute to a potential development decision for the project.

Subject to financing, WLR intends to:

  • Complete 1,500-2,000 meters of exploration drilling to (i) extend the resources on the TM Zone (ii) to conduct infill drilling in the TM Zone with the objective of converting a majority of the inferred resources to indicated resources.
  • Conduct 1,000-1,500 meters of exploratory drilling on known areas of mineralization on the Blue Heaven claims.
  • Metallurgical testing including pre-concentration (ore sorting / dense heavy media separation) assessments.
  • Conduct additional environmental and socio-economic studies to support a possible development application for the project. This is expected to include examining opportunities for partnerships with local First Nations.
  • Initiate a Preliminary Economic Assessment of the project which will include preliminary engineering and a preliminary transportation/logistics analysis.

Qualified Persons

The resource evaluation work was completed by Mr. Charley Murahwi, M.Sc. P.Geo., FAusIMM and Richard Gowans, B.Sc, P.Eng of MICON International Limited. Mr. Murahwi conducted a personal inspection of the Silver Hart Project on August 17-20, 2021. Dr. Gloria Lopez, PhD, P.Geo. of Ronacher-McKenzie Geosciences Inc. was a contributing author and conducted a personal inspection of the Silver Hart Project on September 16, 2025. This information release has also been reviewed and approved by the Qualified Persons.

About Walker Lane Resources Ltd.

Walker Lane Resources Ltd. is a growth-stage exploration company focused on the exploration of high-grade gold, silver and polymetallic deposits in the Walker Lane Gold Trend District in Nevada and the Rancheria Silver District in Yukon/B.C. and other property assets in Yukon. The Company intends to initiate an aggressive exploration program to advance the Tule Canyon (Walker Lane, Nevada) and Amy (Rancheria Silver District, B.C.) projects through drilling programs with the aim of achieving resource definition in the near future.

For more information, please consult the Company’s filings, available at www.sedarplus.ca. Also please feel free to call Kevin at the number below.

ON BEHALF OF THE BOARD OF DIRECTORS

Kevin Brewer
CEO and Director
Walker Lane Resources Ltd.

Cautionary and Forward Looking Statements

This press release and related figures and/or tables, contain certain forward-looking information and forward-looking statements as defined in applicable securities laws (collectively referred to as forward-looking statements). These statements relate to future events or our future performance. All statements other than statements of historical fact are forward-looking statements. The use of any of the words ‘anticipate’, ‘plans’, ‘continue’, ‘estimate’, ‘expect’, ‘may’, ‘will’, ‘project’, ‘predict’, ‘potential’, ‘should’, ‘believe’ ‘targeted’, ‘can’, ‘anticipates’, ‘intends’, ‘likely’, ‘should’, ‘could’  or grammatical variations thereof and similar expressions is intended to identify forward-looking statements. These statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements. These statements speak only as of the date of this presentation. These forward-looking statements include, but are not limited to, statements concerning: our strategy and priorities including certain statements included in this presentation are forward-looking statements within the meaning of Canadian securities laws, including statements regarding the Tule Canyon, Cambridge, Silver Mountain, and Shamrock Properties in Nevada (USA), and its properties including Silverknife and Amy properties in British Columbia, the  Silver Hart, Blue Heaven and Logjam properties in Yukon all of which now comprise the mineral property assets of WLR. WLR has assumed other assets of CMC Metals Ltd. including common share holdings of North Bay Resources Inc. (OTC-US: NBRI) and all conditions and agreements pertaining to the sale of the Bishop mill gold processing facility and remain subject to the condition of the option of the Silverknife property with Coeur Mining Inc. (TSX:CDE). These forward-looking statements reflect the Company’s current beliefs and are based on information currently available to the Company and assumptions the Company believes are reasonable. The Company has made various assumptions, including, among others, that: the historical information related to the Company’s properties is reliable; the Company’s operations are not disrupted or delayed by unusual geological or technical problems; the Company has the ability to explore the Company’s properties; the Company will be able to raise any necessary additional capital on reasonable terms to execute its business plan; the Company’s current corporate activities will proceed as expected; general business and economic conditions will not change in a material adverse manner; and budgeted costs and expenditures are and will continue to be accurate.

Actual results and developments may differ materially from results and developments discussed in the forward-looking statements as they are subject to a number of significant risks and uncertainties, including: public health threats; fluctuations in metals prices, price of consumed commodities and currency markets; future profitability of mining operations; access to personnel; results of exploration and development activities, accuracy of technical information; risks related to ownership of properties; risks related to mining operations; risks related to mineral resource figures being estimates based on interpretations and assumptions which may result in less mineral production under actual conditions than is currently anticipated; the interpretation of drilling results and other geological data; receipt, maintenance and security of permits and mineral property titles; environmental and other regulatory risks; changes in operating expenses; changes in general market and industry conditions; changes in legal or regulatory requirements; other risk factors set out in this presentation; and other risk factors set out in the Company’s public disclosure documents. Although the Company has attempted to identify significant risks and uncertainties that could cause actual results to differ materially, there may be other risks that cause results not to be as anticipated, estimated or intended. Certain of these risks and uncertainties are beyond the Company’s control. Consequently, all of the forward-looking statements are qualified by these cautionary statements, and there can be no assurances that the actual results or developments will be realized or, even if substantially realized, that they will have the expected consequences or benefits to, or effect on, the Company.

The information contained in this presentation is derived from management of the Company and otherwise from publicly available information and does not purport to contain all of the information that an investor may desire to have in evaluating the Company. The information has not been independently verified, may prove to be imprecise, and is subject to material updating, revision and further amendment. While management is not aware of any misstatements regarding any industry data presented herein, no representation or warranty, express or implied, is made or given by or on behalf of the Company as to the accuracy, completeness or fairness of the information or opinions contained in this presentation and no responsibility or liability is accepted by any person for such information or opinions. The forward-looking statements and information in this presentation speak only as of the date of this presentation and the Company assumes no obligation to update or revise such information to reflect new events or circumstances, except as may be required by applicable law. Although the Company believes that the expectations reflected in the forward-looking statements and information are reasonable, there can be no assurance that such expectations will prove to be correct. Because of the risks, uncertainties and assumptions contained herein, prospective investors should not read forward-looking information as guarantees of future performance or results and should not place undue reliance on forward-looking information. Nothing in this presentation is, or should be relied upon as, a promise or representation as to the future. To the extent any forward-looking statement in this presentation constitutes ‘future-oriented financial information’ or ‘financial outlooks’ within the meaning of applicable Canadian securities laws, such information is being provided to demonstrate the anticipated market penetration and the reader is cautioned that this information may not be appropriate for any other purpose and the reader should not place undue reliance on such future-oriented financial information and financial outlooks. Future-oriented financial information and financial outlooks, as with forward-looking statements generally, are, without limitation, based on the assumptions and subject to the risks set out above. The Company’s actual financial position and results of operations may differ materially from management’s current expectations and, as a result, the Company’s revenue and expenses. The Company’s financial projections were not prepared with a view toward compliance with published guidelines of International Financial Reporting Standards and have not been examined, reviewed or compiled by the Company’s accountants or auditors. The Company’s financial projections represent management’s estimates as of the dates indicated thereon.

SOURCE Walker Lane Resources Ltd

View original content to download multimedia: http://www.newswire.ca/en/releases/archive/January2026/21/c0060.html

News Provided by Canada Newswire via QuoteMedia

This post appeared first on investingnews.com

(TheNewswire)

Toronto, Ontario January 21, 2026 TheNewswire – Laurion Mineral Exploration Inc. (TSX-V: LME | OTCQB: LMEFF | FSE: 5YD) (‘LAURION’ or the ‘Company’) announces the appointment of Pierre-Jean Lafleur, P.Eng., as the Company’s new Qualified Person, effective immediately.

Pierre-Jean is a highly experienced geological engineer and consultant who has authored numerous National Instrument 43-101 – Standards of Disclosure for Mineral Projects (‘NI 43-101’) technical reports for gold and mineral resource projects, including Duparquet (Québec), Balabag (Philippines) and Lac Lamêlée (iron ore, Québec), demonstrating deep expertise in gold, base metals, and international resource evaluation. He specializes in property evaluation, mineral resource estimation and various aspects of exploration and mining project management.

Pierre-Jean brings exactly the combination of geological insight, Qualified Person leadership, and technical discipline that aligns with our execution priorities,‘ said Cynthia Le Sueur-Aquin, President and CEO of LAURION. ‘His experience strengthens our ability to advance Ishkōday through disciplined interpretation, integrated modelling, and technically grounded decision-making as the project continues to evolve.’

The Company also extends its sincerest thanks to Jean-Philippe Paiement, P.Geo., for his contributions and efforts during his tenure as the Company’s Qualified Person. LAURION wishes him continued success in his future endeavours.

Strengthened Technical Team to Advance Ishkōday

LAURION has strategically strengthened its technical leadership to support disciplined advancement at the Ishkōday Gold-Polymetallic Project. Pierre-Jean Lafleur and Ali Ben Ayad (Structural-Geophysicist) will lead the integration and synthesis of LAURION’s geological, geophysical, and drilling datasets to refine the A-Zone geological envelope, develop robust 3D wireframes, and establish the technical foundation required for future resource-definition work under NI 43-101.

In parallel, Rogerio Monteiro of Vektore will contribute advanced structural interpretation and grade-vectoring analysis to support the prioritization of step-out targets with potential to extend known mineralization, with initial emphasis on the Sturgeon River Mine area and broader Ishkōday corridor. Vektore’s proprietary spatial-analytic framework transforms grade information into directionally weighted vector fields, supporting early-stage identification of structural trends and high-probability concentration zones.

 

This work will be closely coordinated with Ronacher McKenzie Geoscience (RMG) and LAURION’s internal exploration team to ensure disciplined execution, continuity of interpretation, and alignment across technical workstreams.

Guidance on Timing of NI 43-101 Technical Reports

 

While LAURION is working toward the technical foundation required to support an eventual NI 43-101 compliant technical report expressing a mineral resource estimate (‘MRE’), potentially followed by a subsequent technical report disclosing a preliminary economic assessment (‘PEA’), the Company is not providing guidance on timing of either of these technical objectives. Progress toward an MRE and PEA will depend on multiple factors, including ongoing refinement of geological and structural models, the definition of mineralized continuity through further work and drilling where required, and access to financing to execute the necessary programs. Accordingly, references to NI 43-101 technical reports should be regarded as an ongoing technical objective of the Company, not an indication that the completion dates for an MRE and PEA can be accurately predicted at this stage.

 

LAURION believes the appointment of Pierre-Jean as its new Qualified Person further strengthens the Company’s technical leadership as it continues developing Ishkōday.

 

Qualified Person

The technical contents of this release were reviewed and approved by Pierre-Jean Lafleur, P.Eng, a consultant to LAURION and a Qualified Person as defined by NI 43-101.

 

About LAURION Mineral Exploration Inc.

 

Laurion Mineral Exploration Inc. is a mid-stage junior mineral exploration company listed on the TSX Venture Exchange under the symbol LME and on the OTC Pink market under the symbol LMEFF. The Company currently has 278,716,413 common shares outstanding, with approximately 73.6% held by insiders and long-term ‘Friends and Family’ investors, reflecting strong alignment between management, the Board, and shareholders.

 

LAURION’s primary focus is the 100%-owned, district-scale Ishkōday Project, a 57 km² land package hosting gold-rich polymetallic mineralization. The Company is advancing Ishkōday through a disciplined, milestone-driven exploration strategy focused on strengthening geological confidence, defining structural continuity.

 

LAURION’s strategy is centered on deliberate value creation. The Company is prioritizing systematic technical advancement, integrated geological and structural modeling, and the evaluation of optional, non-dilutive pathways, including historical surface stockpile processing, that may support flexibility in LAURION’s exploration plans without diverting the Company’s focus from its core exploration objectives.

 

The Company’s overarching objective is to build project value before monetization, ensuring that any future strategic outcomes are supported by technical clarity, reduced execution risk, and demonstrated scale. While the Board remains attentive to strategic interest that may arise, LAURION is not driven by transaction timing. Instead, the Company is focused on advancing the Ishkōday Project in a manner that strengthens long-term shareholder value.

 

LAURION will continue to communicate updates through timely disclosure and will issue press releases in accordance with applicable securities laws should any material information arise.

 

FOR FURTHER INFORMATION, CONTACT:

 

Laurion Mineral Exploration Inc.

Cynthia Le Sueur-Aquin – President and CEO

Tel: 1-705-788-9186 Fax: 1-705-805-9256

 

Douglas Vass – Investor Relations Consultant

Email: info@laurion.ca

Website: http://www.LAURION.ca

Follow us on: X (@LAURION_LME), Instagram (laurionmineral) and LinkedIn ()

 

Caution Regarding Forward-Looking Information

This press release contains forward-looking statements, which reflect the Company’s current expectations regarding future events including with respect to LAURION’s business, operations and condition, management’s objectives, strategies, beliefs and intentions, the Company’s ability to advance the Ishkōday Project, the nature, focus, timing and potential results of the Company’s exploration, drilling and prospecting activities in 2026 and beyond, the timing of, and the Company’s ability to complete, any technical reports or milestones regarding the Ishkōday Project, and the statements regarding the Company’s exploration or consideration of any possible strategic alternatives and transactional opportunities, as well as the potential outcome(s) of this process, the possible impact of any potential transactions referenced herein on the Company or any of its stakeholders, and the ability of the Company to identify and complete any potential acquisitions, mergers, financings or other transactions referenced herein, and the timing of any such transactions. The forward-looking statements involve risks and uncertainties. Actual events and future results, performance or achievements expressed or implied by such forward-looking statements could differ materially from those projected herein including as a result of a change in the trading price of the common shares of LAURION, the TSX Venture Exchange or any other applicable regulator not providing its approval for any strategic alternatives or transactional opportunities, the interpretation and actual results of current exploration activities, changes in project parameters as plans continue to be refined, future prices of gold and/or other metals, possible variations in grade or recovery rates, failure of equipment or processes to operate as anticipated, the failure of contracted parties to perform, labor disputes and other risks of the mining industry, delays in obtaining governmental approvals or financing or in the completion of exploration, as well as those factors disclosed in the Company’s publicly filed documents. Investors should consult the Company’s ongoing quarterly and annual filings, as well as any other additional documentation comprising the Company’s public disclosure record, for additional information on risks and uncertainties relating to these forward-looking statements. The reader is cautioned not to rely on these forward-looking statements. Subject to applicable law, the Company disclaims any obligation to update these forward-looking statements. All sample values are from grab samples and channel samples, which by their nature, are not necessarily representative of overall grades of mineralized areas. Readers are cautioned to not place undue reliance on the assay values reported in this press release.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICE PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

  

Copyright (c) 2026 TheNewswire – All rights reserved.

News Provided by TheNewsWire via QuoteMedia

This post appeared first on investingnews.com

Air Force One was forced to return to Joint Base Andrews shortly after takeoff Tuesday evening with President Donald Trump aboard, the White House said.

The crew experienced a ‘minor electrical issue’ after takeoff at 10:20 p.m. and returned ‘out of an abundance of caution,’ according to White House Press Secretary Karoline Leavitt.

Trump was en route to Davos, Switzerland, to attend the World Economic Forum.

Air Force One landed at Joint Base Andrews at 11:07 pm. The president is expected to board a different aircraft and continue on to Switzerland.

Leavitt joked aboard Air Force One that a Qatari jet sounded ‘much better’ at the moment.

The lights in the press cabin briefly went out after takeoff, reporters on board said.

This is a developing story. Please check back for updates.

This post appeared first on FOX NEWS

Israeli Prime Minister Benjamin Netanyahu said Wednesday he would join President Donald Trump’s new Board of Peace, after previously criticizing the makeup of its executive committee.

Netanyahu confirmed that he would join the newly established Board of Peace, which the Trump administration says will supervise the next phase of the Gaza peace plan.

The Israeli prime minister’s announcement comes after he initially pushed back on Trump’s proposal, following the inclusion of Turkey’s Foreign Minister Hakan Fidan and Qatari diplomat Ali Al-Thawadi as appointed members to a separate ‘Gaza Executive Board.’

Netanyahu’s office said that move was not coordinated with Israel and ‘runs contrary to its policy.’

The announcement coincides with Trump’s trip to the World Economic Forum meeting in Davos, Switzerland, where he is expected to provide more details about the board. Fox News confirmed that the president is planning to arrange a signing ceremony for the Gaza Board of Peace during his visit.

On Tuesday, when asked if the board should replace the United Nations, Trump said, ‘It might.’

Trump said that the world body ‘hasn’t been very helpful’ and ‘has never lived up to its potential,’ but added that the U.N. should continue to exist ‘because the potential is so great.’

On Jan. 16, the White House said the Board of Peace will play an ‘essential role’ in carrying out all 20 points of the president’s Gaza plan, including providing strategic oversight, mobilizing international resources and ensuring accountability as Gaza transitions from conflict to peace and development.

Dozens of countries have been invited, with notices going out over the weekend, according to officials, including Belarus, China, Ukraine, India, Canada, Argentina, Jordan, Egypt, Hungary, and Vietnam, among others.

Others, including the executive arm of the European Union, confirmed that they have received invitations, but have not responded.

On Monday, Trump confirmed that Russian President Vladimir Putin received an invitation to join the new board.

The Kremlin said Putin had received the invitation and was ‘studying the details,’ adding it will seek clarity on ‘all the nuances’ in communications with the U.S. government.

France also received an invitation, but does not plan to join ‘at this stage,’ according to a French official close to President Emmanuel Macron.

The White House has said Trump will chair the Board of Peace and be joined by senior political, diplomatic and business figures, including Jared Kushner, Secretary of State Marco Rubio, U.S. special envoy Steve Witkoff, and billionaire Marc Rowan.

Fox News Digital’s Landon Mion, Ashley Carnahan, Gillian Turner and The Associated Press contributed to this report.

This post appeared first on FOX NEWS

President Donald Trump has Europe on edge as he prepares to meet with foreign leaders in Davos, Switzerland, Wednesday and Thursday at the World Economic Forum.

The World Economic Forum is a Switzerland-based organization that convenes global political leaders, business executives, academics and activists each year in Davos to discuss major economic, political and social issues, with the U.S. and Trump expected to take center stage this year. Leaders from Germany to France to Norway and beyond are expected to attend. 

Calls for the U.S. to acquire Greenland and tariff threats loom over the event as Trump puts European allies on notice to reach a deal on the island by Feb. 1 or face the consequences. Goods from Denmark, Finland, France, Germany, the Netherlands, Norway, Sweden and the United Kingdom will face a 10% tariff if no deal is reached by February, with the taxes increasing to 25% by June 1 if there is no deal. 

Top European leaders have balked over Trump’s demands to make a deal on Greenland, citing that NATO allies can work together to ensure the Arctic is secure. Greenland is a self-governing Danish territory nestled between North America and Europe in the Arctic Circle. 

Trump wants to acquire the island — the largest island in the world –—from a national security standpoint, noting Russia’s and China’s growing presence in the Arctic. Greenland as a pivotal outpost during the Cold War because it was along the shortest routes between North America and the Soviet Union, allowing for speedy missile detection. 

The World Economic Forum kicked off Monday, with some European leaders questioning their relationship with the U.S. as tariff threats loom. The threats follow the U.S. and EU reaching a comprehensive trade framework in 2025 that fixed a 15% tariff level on most EU exports. 

‘The European Union and the United States have agreed to a trade deal last July,’ European Commission President Ursula von der Leyen said from Davos on Monday, according to The Associated Press. ‘And in politics as in business — a deal is a deal. And when friends shake hands, it must mean something.’

‘We consider the people of the United States not just our allies, but our friends. And plunging us into a downward spiral would only aid the very adversaries we are both so committed to keeping out of the strategic landscape,’ she added.

Greenland’s Prime Minister Jens-Frederik Nielsen said from a press conference in Nuuk ahead of the forum that there needs to be respect for ‘territorial integrity.’ 

‘International law, it’s not a game,’ he said. ‘We have been a close and loyal ally to the United States, to NATO, through many, many, many years. We can do lots more in that framework. We are willing to cooperate much more, but of course in mutual respect, and if we cannot see that, it will be very difficult to have a good and reliable partnership.’

Trump is set to hold a signing ceremony for the Gaza Board of Peace in Davos, Fox News confirmed Tuesday, which is styled as a new oversight body tied to the next phase of the Gaza peace plan. ‘Dozens’ of countries have been invited to join the board, Fox News confirmed. 

Some invited countries, however, have raised concerns about the terms of the proposed Gaza peace board, as participation would come with a substantial financial commitment, adding to the heightened tensions at the forum, Bloomberg reported. 

French President Emmanuel Macron, for example, has increasingly become a target for Trump’s criticisms and denied membership on the board. 

Macron’s office said the Board of Peace proposal ‘goes beyond the framework of Gaza and raises serious questions, in particular with respect to the principles and structure of the United Nations, which cannot be called into question,’ according to Politico. 

Trump threatened additional tariffs on France when asked about Macron’s refusal to join the board. 

‘I’ll put a 200 percent tariff on his wines and Champagnes and he’ll join. But he doesn’t have to join,’ Trump told reporters on Monday. 

Trump is expected to kick off his first day in Davos at about 8 a.m. EST for a day of events and meetings, before returning to the U.S. Thursday. 

Fox News Digital’s Ashley Carnahan contributed to this report. 

This post appeared first on FOX NEWS

Former Rep. Marjorie Taylor Greene — a Republican who left office earlier this year after a falling out with President Donald Trump last year — poured cold water on the president’s ambitions to add Greenland to the U.S.

‘We are approaching $40 Trillion in debt and Social Security is going to be insolvent by 2033. Is anyone even talking about how much it’s going to cost the American people to take over Greenland?’ Greene asked in a Tuesday post on X.

‘Saying it’s ‘for your safety’ is not sufficient. We’ve heard that one before and it didn’t turn out so well,’ she added.

The U.S. national debt is more than $38.46 trillion, according to fiscaldata.treasury.gov.

Trump has said the U.S. needs to acquire Greenland as a matter of national security.

‘The United States needs Greenland for the purpose of National Security. It is vital for the Golden Dome that we are building,’ he asserted in part of a Truth Social post last week.

‘China and Russia want Greenland, and there is not a thing that Denmark can do about it,’ he declared in part of another Truth Social post last week. 

‘Nobody will touch this sacred piece of Land, especially since the National Security of the United States, and the World at large, is at stake,’ he asserted. ‘Now, because of The Golden Dome, and Modern Day Weapons Systems, both Offensive and Defensive, the need to ACQUIRE is especially important.’

This post appeared first on FOX NEWS

House Oversight Committee Chairman James Comer, R-Ky., is calling for bipartisanship on a key vote that could lead to former President Bill Clinton and ex-Secretary of State Hillary Clinton facing criminal charges.

Comer will ask Democrats to join Republicans in teeing up House-wide votes on holding the Clintons in contempt of Congress on Wednesday, after both defied subpoenas to appear for his committee’s probe into Jeffrey Epstein.

‘The Committee does not take this action lightly. But subpoenas are not mere suggestions; they carry the force of law and require compliance,’ Comer will say, according to an excerpt obtained by Fox News Digital. ‘Former President Clinton and Secretary Clinton were legally required to appear for depositions before this Committee. They refused.’

Comer’s statement will also argue the committee ‘acted in good faith’ in trying to schedule the depositions but that ‘actions have consequences.’

‘We’ve offered flexibility on scheduling. The response we received was not cooperation, but defiance, marked by repeated delays, excuses, and obstruction,’ Comer will say. ‘Today, the Clintons must be held accountable for their actions. And Democrats must support these measures, or they will be exposed as hypocrites.’

The committee is meeting at 10 a.m. on Wednesday to mark up a pair of reports on holding the Clintons in contempt. 

If they pass — which they are expected to do, largely along party lines — it will pave the way for the full House to vote on whether to refer the Clintons to the Department of Justice (DOJ) for prosecution.

‘We must do what is necessary to uphold Congress’s investigative authority, which is imperative to the legislative process,’ Comer will say. ‘And we are doing so to demonstrate to the American people that justice is applied equally to everyone, regardless of position, pedigree, or prestige.’

A contempt of Congress conviction is a misdemeanor that carries a maximum fine of $100,000 and up to one year in jail.

Steve Bannon and Peter Navarro, associates of President Donald Trump, were each found guilty of the charge after defying subpoenas sent by the now-defunct House select committee on the Jan. 6 Capitol riot.

The Clintons were two of 10 people Comer subpoenaed over the summer as part of the Oversight Committee’s probe into Epstein. But despite the initial bipartisan push, the investigation has fallen into partisan infighting as both sides accuse the other of politicizing the probe at the expense of Epstein’s victims.

Rep. Robert Garcia, D-Calif., the top Democrat on the committee, accused Comer of hypocrisy in trying to hold the Clintons accountable while not pushing harder to enforce the subpoena aimed at forcing the DOJ to release all of its Epstein files, which it has not yet done.

‘I think it’s incredibly hypocritical for James Comer to go out and try to hold in contempt his political enemies while [Attorney General Pam Bondi] is actively breaking the law, and he refuses to hold her in contempt,’ Garcia told MS NOW last week.

Comer also issued a statement on Tuesday stating that he rejected an offer from Bill Clinton’s lawyer for himself and Garcia to sit down with the former president in New York, for an interview without an ‘official transcript.’

‘The House Oversight Committee rejects the Clintons’ unreasonable demands and will move forward with contempt resolutions on Wednesday due to their continued defiance of lawful subpoenas,’ Comer said.

This post appeared first on FOX NEWS